Report 1 – What to Build for Class C Ignition
Report 2 – New SAM Ship (96 Lanzo Bomber)
Report 3 – Stab Parts
Report 4 – Integrating Tip Spline with Trailing Edge
Report 5 – Integrating Tip Spline with Leading Edge
Report 6 – Initial Bomber Stab Lay Up
Report 7 – Bomber Stab Center Section (Part 1)
Report 8 – Bomber Horizontal Tail Framing
Report 9 – Added Elevator Diagonals
Report 10 – Bomber Stab Completion
Report 11 – Bomber Fin
Report 12 – Bomber Horizontal Tail Structure
Report 13 – Fuselage Stab Mounting Platform
Report 14 – Fuselage Jigging for Bonding Stab Platform
Report 15 – Implementing Alfredo Herbon’s Stab Squaring Procedure
Report 16 – Bomber Stab Platform Glued to Fuselage
Report 17 – Completion of the Bomber’s Vertical Tail
Report 18 – Bomber Structure Storage
Report 19 – Bomber Plyon
Report 20 – Fitting the Plyon Frame to the Bomber Fuselage
Report 21 – Bomber Wing Dowel Pins
Report 22 – Completed Bomber Pylon Frame with Rib Structure
Report 23 – Revised Bomber Pylon Jigging
Report 24 – Bomber Pylon Attachment
Report 25 – Epoxied Pylon Frame Attachment
Report 26 – Bomber Hang Up
Report 27 – Bomber Pylon Planking Complete
Report 28 – Bomber Ignition Unit
Report 29 – Bomber’s Ignition Hatch
Report 30 – Bomber Ignition Cut Off Linkage
Report 31 – Bomber Ignition Wiring
Report 32 – High Tension Lead fro the Bomber
Report 33 – Bomber Fuselage Hatches and Forward Planking Complete
Report 34 – Bomber Push Rod Installation
Report 35 – Bomber’s Antenna Tube
Report 36 – Jigging the Wing Saddle
Report 37 – Bob Beecroft’s Epoxy Fillet Technique
Report 38 – Pylon_Wing Saddle Epoxy Fillet
Report 39 – Left Side of Pylon Epoxy Fillet
Report 40 – Bomber’s Wing Saddle Twist is Gone
Report 41 – Bomber Wing Short Center Section
Report 42 – aLay Up of Bomber wing Short Center Section
Report 43 – Stupid Stupid Mistake!
Report 44 – Center Section TE Removal
Report 45 – Center Section TE Replacement
Report 46 – Trailing Edge Gussets
Report 47 – Message from Tandy
Report 48 – Center Section Structure Complete
Report 49 – Big Bomber Wing Tips
Report 50 – Wing Tip Panel Ribs
Report 51 – Tip Panel Rib Proof Test
Report 52 – Starting the Left Wing Tip Panel
Report 53 – Tip Panel Top Spars
Report 54 – Starting the Big Bomber’s Right Wing Tip Panel
Report 55 – Bomber’s Wing Panels
Report 56 – Integrated Wing Tip
Report 57 – Added Balsa for Integrated Right Wing Tip
Report 58 – Both Wing Tips Fully Integrated
Report 59 – Attaching the Bomber’s Right wing Tip Panel to the Center
Report 60 – Bracing the Bomber’s Right wing Tip Panel Dihedral Joint
Report 61 – Bracing the Bomber’s Right wing Tip Panel Dihedral Joint
Report 62 – Bomber Radio Installation
Report 63 – Assembled Fuselage
Report 64 – Trial Fit of the Bomber’s Left Wing Tip Panel
Report 65 – Attachment of the Bomber’s Left Wing Tip Panel
Report 66 – Completed One-Piece Bomber Wing Structure
Report 67 – Revised 96_ Bomber Structure Complete
Report 68 – Bomber Control Surface Hinge Pin Retention Design
Report 69 – Bomber Fin First Covering
Report 70 – Bomber Vertical Tail Polyspan Lite First Covering
Report 71 – Bomber Vertical Tail Silk Over Polyspan Lite Second Cover
Report 72 – Covering Bomber Fuselage with Polyspan Lite
Report 73 – Covering Bomber Fuselage with Polyspan Lite
Report 74 – Covering Bomber Pylon with Silk
Report 75 – Bomber’s Fuselage First Covering Finished and Doped
Report 76 – Bomber’s Fuselage Second Silk Covering Finished
Report 77 – Sub-Rudder Attachment to Bomber’s Fuselage
Report 78 – Sub-Rudder Attachment to Bomber’s Fuselage
Report 79 – Bomber’s Stabilizer and Elevator Covering
Report 80 – Paint Trim on Big Bomber Fin
Report 81 – Covering Bomber Wing
Report 82 – Covering the Top of the Bomber Wing
Report 83 – Bomber One-Piece 96_ Wing Complete
Report 84 – Painting Mandrel for the Bomber Fuselage
Report 85 – Paint Stands for Bomber
Report 86 – Airbrushing Klass Coat
Report 87 – Bomber Fueslage Color Trim
Report 88 – Bomber Klass Kote Spraying Completed Today
Report 89 – Assembly Part 1
Report 90 – Assembly Part 2
Report 91 – Assembly Part 3
Report 92 – Wing saddle Cushion
Report 93 – Tail Skid Revision
Report 94 – Friday Morning Bomber Flight Tests 080829
Report 95 – Final FASST Receiver Antenna Configuration For the Big Bomber
Report 96 – Provisions for Using the Ohlsson 60 in the Big Bomber
Report 97 – Weight and Balance for the Ohlsson 60 Powered Big Bomber
Report 98 – Trouble Shooting the big Bomber’s Ignition System
Report 99 – Shock Mounting Design for the Big Bomber’s Fuel Tank